Lowick Village Hall

After GMC won a competitive tender work started removing existing floors throughout the building to make way for new insulation and sub-floors. Which received under-floor heating pipes serviced by the already installed ground source heat pump.


New drainage was installed to service the new lavatory arrangement. All internal walls were framed and insulated, while the stage area of historical and sentimental value was carefully restored using modern yet sympathetic methods and materials to retain its character as much as possible.


The existing suspended celling removed and the original celling with exposed pitch pine king trusses was revealed and restored and insulated.


GMC worked with the village hall committee members and remained versatile and dynamic through out the project to ensure the village hall was delivered on time and to the highest of standards.


Solar PV

GMC Have sucsessfully installed over 200KW of Solar PV with over 100completed installations, from 2 panels supplying 500w upto 200 panels supplying 50KW

Read More

Planning Permission

GMC Building Contractors

Eco Home gets planning permission and building regulations approved.

Read More

Sovereign Approved

GMC Building Contractors become Sovereign approved Contractor

GMC Building Contractors have recently been approved as a registered contractor for Sovereign Chemicals.

Read More