Meadow Lands
Berwick upon Tweed
2.4KW/h Solar Photovoltaic Array

10 x 245W Sharp Monocrystaline Modules
1 x SMA SB2500 Inverter
Click fit mounting System
This system was fully mounted by 2 GMC roofers in 5 hours and fully comissioned and producing electricity by 3pm the same day.
The inverter is located in the attic above the garage with only total generation meter and AC isolation switch visible next to the electrical control pannel.
The system is working above the estimated output and the customers are enjoying free energy durring daylight hours and the feed-in-tarrif is suplementing their other energy costs.
This system is expected to produce in excess of 1,800KW/h of electricity per annum, earning the owner in region of £800.00 tax free.
GMC Have sucsessfully installed over 200KW of Solar PV with over 100completed installations, from 2 panels supplying 500w upto 200 panels supplying 50KW
GMC Building Contractors
Eco Home gets planning permission and building regulations approved.
GMC Building Contractors become Sovereign approved Contractor
GMC Building Contractors have recently been approved as a registered contractor for Sovereign Chemicals.
GMC Building Contractor - The Workshop, Princes St, Spittal, Berwick upon Tweed. TD15 1Qx Tel: 01289 304409