Flood damage (April 2010)

Flood damage repair

Flood Damage repairs started. After the heavy rain fall during November 2009 several properties close to the Tweed and surrounding water courses where flood damaged. GMC were brought in to this project for the drying out stage.

The research and development team developed a drying out strategy over an eight week programme. During this time moisture content levels were taken and recorded for analysis. Once these readings were at an expectable level, the property is declared dry the reinstatement process begins. GMC are currently restoring this property. While also taking measures to the clients requirement to up-grade the properties flood defense system.

Damp proofing chemical applied to external wall and floor junction to prevent damp penetration.

During the drying out stage GMC were Commited to this project whatever obstacles arose!



GMC have now completed the restoration of this property.

GMC kitchen Retail supplied and installed this Crown kitchen with fully intergrated appliences.

Our GMC kitchen design team took on board the clients kitchen brief requesting a contempory kitchen with a traditional feel combined with high levels of function.

GMC completed the full service for this property including

  • Drying the property out
  • Removing water damaged goods
  • monitoring moisture levels during drying stage
  • Re-enstating the damaged areas
  • Supply & installation of new kitchen
  • Co-ordinating all trades  
  • Providing a one person link between client and project

GMC on 'Twitter'

about 3 days ago @GregBarkerMP Excellent! End of the year would be nice to help the solar PV industry get back on its feet.
about 5 days ago With reductions in Solar PV install prices, systems are offering similar returns as the higher tariff!
about 12 days ago Tell us what your Generating today!
about 15 days ago What a lovely day, 4kw solar pv in spittal has generated 30 kw's today! Another reason to smile when it's sunny! #happy!
about 17 days ago Counting down now Solar PV Current Tariff of 21p gets reviewed in 58 days!! Beat the Rush and Install now! 4.0 KW System now £7,140.00+VAT
about 18 days ago Latest Construction photos on our facebook page, check it out @ http://t.co/ttHv9Wm1
about 25 days ago Traditional by looks but a highly sophisticated Low energy home by GMC. http://t.co/fDzILJfb
about 27 days ago Solar Photovoltaic, Scottish borders 4kw array produces 3800kw's in 10 months! Note April as highest generation month! http://t.co/LoXJchUh
19 Apr 2012 G.M.C Solar PV installer team finishing 20 KW Sharp Array for Hotel in Scottish Borders http://t.co/xmibUe3E
18 Apr 2012 Energy Efficient homes under Construction at GMC. Impressive thermal performance provided by our latest timber frame. http://t.co/iHXsS1V7
17 Apr 2012 Feed in tariff payments increase by 4.8%. This means 43.3p rate will receive 45.4p per kWh from the 1st April 2012.
17 Apr 2012 4.0 KW Solar Photovoltaic Example Investment £8,000.00 (including VAT) returning over £1,000.00 per year including £800.00 tax free!!!
16 Apr 2012 GMC full MCS registration details up-dated to include Solar PV & Thermal along side heat pumps! http://t.co/P3qJaPPB
5 Apr 2012 Ground floor joists during installation at our Meadow Grange development of 13 homes 3 & 4 bedrooms available http://t.co/iHZEUy1w
4 Apr 2012 #Solar Photovoltaic still Viable investment 4.0KW systems from £8,500.00 with returns of over £1,000.00 tax free per year.

Solar PV

GMC Have sucsessfully installed over 200KW of Solar PV with over 100completed installations, from 2 panels supplying 500w upto 200 panels supplying 50KW

Read More

Planning Permission

GMC Building Contractors

Eco Home gets planning permission and building regulations approved.

Read More

Sovereign Approved

GMC Building Contractors become Sovereign approved Contractor

GMC Building Contractors have recently been approved as a registered contractor for Sovereign Chemicals.

Read More